DYNAMIC ROAD CHARGING

A road that charges what drives over it

An equipped road section transfers power wirelessly to compatible electric vehicles while they move. With no plug to connect, no overhead equipment to reach and no charging stop to schedule, the road becomes part of the vehicle’s energy supply.

Under road surfaces since 2000
Measured at 180 kW and 80 km/h
Test and pilot projects
Aerial view of a curved multi-lane highway with several cars, two trucks, and a bus driving in opposite directions, surrounded by dense green forest.
Year 2000
First electric roadway pilot
1.2 km
Electric roadway in Florida
3
Vehicle classes demonstrated
90%
Measured at 180 kW and 80 km/h
Dynamic charging across transport networks

From highways to terminals, the route delivers the energy

An equipped road can charge vehicles at motorway speed or along a controlled route. The same principle works from freight corridors and bus routes to airports, taxi lanes, ports and terminals. Each installation is designed around the speed, traffic pattern, energy demand and charging time available.

Image description
Dynamic wireless charging for highways

The road charges the vehicle while it drives

Heavy vehicles need large amounts of energy throughout the working day. When charging can only happen while parked, that energy has to come from longer stops, larger batteries or a combination of both.

An equipped road section adds energy while the vehicle keeps moving. Sections can be placed where recurring traffic and energy demand make them most effective, such as freight corridors, port approaches, climbing lanes and routes used repeatedly by the same fleet.

Equip the sections that make the difference

The entire route does not have to be equipped. The position and length of each section are determined by the traffic pattern, vehicle energy demand and the amount of energy the route has to deliver.

Different vehicles can use the same road infrastructure

An equipped section can be designed for compatible cars, buses and trucks. Each vehicle takes energy within the limits of its receiver, battery and onboard charging system.

The active equipment remains accessible

The windings beneath the running surface are passive and sealed. Power electronics and controls are positioned beside the carriageway, where they can be accessed without placing charging structures above the traffic.

Sections activate as the vehicle passes

The system detects a compatible vehicle and activates the relevant section beneath it. The section is switched off again after the vehicle has passed.

Electric road system integration

The road, vehicle and power supply work as one system

Windings beneath the road transfer energy to a receiver under the vehicle. Roadside equipment supplies and controls each section. ENRX IPT develops each application with road authorities, universities, research organisations, system integrators and vehicle manufacturers, from feasibility and system design through testing and commissioning.

Our solutions

Meet the system behind
dynamic road charging

Our system for transferring energy from equipped road sections to compatible vehicles while they drive.

Image description
Dynamic charging on controlled routes

Charging becomes part of the route vehicles already use

Not every electric road is a motorway. Buses follow fixed corridors, taxis move through ranks and vehicles at airports, ports and terminals return to the same routes throughout the day.

An equipped run follows that movement. It adds energy while vehicles drive, queue, or pause within the operation, without sending them to a separate charging area.

Repeated movements create repeated charging opportunities

A vehicle may pass over the same equipped section many times during a shift. Each pass adds energy and can reduce the amount that has to be restored later while the vehicle is parked.

The operating route stays clear

The windings sit beneath the surface and the power equipment stands beside the route. There are no loose cables, charging arms or overhead structures in the path of buses, trucks or automated vehicles.

Charging starts automatically

The vehicle is detected and energy transfer begins without a cable, plug or driver action. This also makes the system suitable for automated and driverless vehicles.

Start where infrastructure and vehicles are decided together

Ports, terminals, airports, taxi ranks and dedicated bus corridors often have a clearly defined operator and vehicle group. This allows the road and vehicle interfaces to be developed as one project.

Watch

Video’s about Electric Roadway Charging

Construction workers in safety vests working on installing a cable grid embedded in concrete along a roadside with construction equipment and vehicles in the background.

Building the next generation electric roadway

Electric road project track record

Test tracks, vehicle pilots and public-road development since 2000.

Explore our electric road projects →

PROJECT
LOCATION & YEAR
SYSTEM
PROJECT FOCUS
Large white vehicle with red equipment on top driving on a paved road with metal guardrails on both sides, surrounded by dry vegetation and trees in the background.
PWRI electric roadway test
Tsukuba, Japan · 2000
160-metre test section · 90 kW
Road-surface integration and durability testing
A Bombardier light rail train with a blue and yellow front travels on snow-covered tracks flanked by metal fences and bare trees under a clear sky.
Augsburg dynamic charging tram pilot
Augsburg, Germany · 2010
200 kW · 800 m equipped tram section · low-floor tram
Contactless power transfer for catenary-free tram operation
A white and gray city bus with yellow accents driving on a paved road surrounded by green trees and a blue sky with some clouds.
Lommel dynamic charging pilots
Lommel, Belgium · 2014
Two equipped 200 kW test sections
Dynamic bus charging beneath concrete and asphalt surfaces
Blue Scania R 480 truck driving on a road between fenced areas with a large building with a red roof in the background.
Scania dynamic charging pilots
Mannheim, Germany · 2016
Two 200 kW pilot sections · heavy-duty truck
High-power dynamic charging for heavy-duty road transport
A wide concrete pathway beside a road with traffic cones and two overpasses in the distance under a blue sky.
InductInfra autobahn research
Aachen, Germany · 2023
100 kW equipped autobahn research section
Integrating dynamic charging into motorway infrastructure
Front view of a blue semi-truck parked on a concrete surface between a fence and buildings under a clear blue sky.
ASPIRE EVR test track
Logan, Utah, USA · 2025
40-metre high-power 220 kW test track
Power delivery, vehicle compatibility and roadway integration
Overhead view of workers installing electrical components on a concrete roadway section beside a fenced area, with a white truck and construction equipment visible nearby.
CFX State Road 516 electric roadway
Florida, USA · 2027
1.2-kilometre section · 220 kW design
Next-generation dynamic charging on a public expressway
Scroll to see the full table
PROVEN IN DAILY OPERATION

At work every day. For decades

Case study image
State Road 516, Central Florida, USA

Florida SR 516 brings wireless charging to a public highway

1.2 km

planned charging pilot length

220 kW

primary-side design rating

200 kW

target vehicle-side output

View case study
Case study image
Logan, Utah, USA

ASPIRE built a next-generation electric roadway test section in Utah

40 m

concrete test track installed

220 kW

primary-side design rating

85 kHz

system frequency

View case study
Case study image
Mannheim, Germany

Scania truck tested 180 kW dynamic charging in Mannheim

180 kW

power transferred

90%+

measured efficiency

60–80 km/h

tested driving speeds

View case study
Case study image
DuraBASt test facility, Germany

InductInfra advanced 85 kHz dynamic roadway integration

85 kHz

next-generation frequency

50 m

demonstrator length

5 m

modular charging segments

View case study
Case study image
Lommel, Belgium

Dynamic wireless road charging demonstrated in Lommel

125 m

equipped road

40 kW

maximum power transferred in trials

2

vehicle types tested

View case study
Case study image
Augsburg, Germany

Augsburg explored stationary and dynamic PRIMOVE charging

2010

tram demonstration began

2

stationary and dynamic modes

Urban

tram and bus applications

View case study

Bring us the route. We’ll work out where charging belongs

Share the route, traffic pattern, vehicle mix, energy demand and available grid connection. Together, we can determine whether dynamic charging, stationary charging or a combination best fits the operation.

Discuss your application
View of Earth from space showing the Indian subcontinent, surrounding countries, the Arabian Sea, and the Bay of Bengal with cloud formations and a dark space background.
Portrait of Christian Köbel.

Christian Köbel

Director of Sales & Business Development
christian.koebel@enrx.com+41 79 770 54 26
Portrait of Dr Sergio Perez.

Dr Sergio Perez

Business Developer Manager e-Mobility
sergio.perez@enrx.com+49 151 467 20 611

What road authorities and fleet operators ask us

These questions come up in almost every first conversation.

Discuss your application

How efficient is charging at road speed?

Approximately 90% was measured at 180 kW and 80 km/h during a Scania truck pilot. Efficiency depends on the complete road and vehicle design, including alignment, air gap and operating point. A measured efficiency figure therefore belongs to the conditions under which it was recorded.

What happens in snow, salt, water and ice?

The charging path has no exposed electrical contact that has to connect with the vehicle. The windings are sealed beneath the surface and the active power equipment is positioned beside the road.

Drainage, frost conditions, road maintenance and the operating temperature of the equipment are addressed as part of the civil and system design.

Is the system safe for road users and vehicle occupants?

The relevant section is activated when a compatible vehicle is above it and switched off again after the vehicle has passed.

The complete road-and-vehicle system is designed, tested and commissioned against the applicable electrical, electromagnetic-exposure and vehicle-compatibility requirements.

What happens if one road section is unavailable?

An equipped route consists of multiple sections. If one section is unavailable, the vehicle continues driving and receives less energy over that part of the route rather than being stopped by a single failed charging point.

The required monitoring, redundancy, spares and service response are determined with the operator during the project.

Does the road have to be excavated?

The road structure has to be prepared, but the charging system will not always be assembled piece by piece on site. Current pilot installations integrate the windings during construction. For wider deployment, ENRX IPT and its partners are developing prefabricated roadway slabs with the charging system already incorporated.

These modules are designed to be placed quickly into a prepared road structure, reducing installation work and road closure time. Local contractors prepare the road, ducting and grid connection, while ENRX IPT covers the charging-system engineering, road and vehicle equipment, interfaces, testing and commissioning.

‍

Which vehicles can use an equipped section?

Cars, buses, trucks and specialist vehicles can use the principle when fitted with a compatible receiver and onboard interface.

The amount of energy each vehicle accepts depends on its receiver, battery and charging system. Vehicle integration is therefore part of the project design.

When should ENRX IPT become involved?

Before the road design and vehicle specification are fixed. Dynamic charging affects the road structure, roadside power supply, grid connection, vehicle underside, electrical interface and control system.